•  +353 45 879893
  • Value: £1.6M
  • End User: Siemens

One of the most hi‐tech train centres in Europe, the purpose built Three Bridges depot is the size of 13 football pitches.

Design, supply and fix of a 4 number train maintenance access walkways with removable handrails, end access stairs, companion way ladders between levels. Also 800t of rail support way beams.