•  +353 45 879893
  • Value: £450K
  • End User: Hyundai Heavy Industries

Design, fabrication and supply of modular flat packed Steel and GRP gratings and stair treads.

Clair Ridge is the second phase of development of the Clair field which, with an estimated eight billion barrels of oil in place, is the largest undeveloped hydrocarbon resource on
the UKCS.

The £4.5bn investment involves two new bridge-linked platforms.