  • Value: £1.2M
  • End User: Tekfen Construction

Design, fabrication and supply of modular flat packs of steel and GRP gratings, heavy duty barrier rail, gates, ladders, treads and handrails.

Chirag is an offshore production, drilling and quarters (PDQ) platform located 120km east of Baku in the Caspian Sea, at a water depth of 120 meters.

First oil from the platform was achieved on 28 January 2014.

Total Chirag production was on average 53,000 barrels per day.